| February 15, 2010 | |
| 7:30am | Registration & coffee |
| 8:00am-5:00pm | Course |
| February 16, 2010 | |
| 8:00am-4:45pm | Course |
Who should attendThe course is especially designed for project managers, engineers, maintenance and technical personnel responsible for pipeline integrity assurance, flow assurance, corrosion control, and safety. Course NotesIncluded with the course fee is a detailed set of lecture notes and the reference handbook Pipeline Pigging Handbook, 3rd Edition, by J. Cordell and H. Vanzant (272pp - a $125 value) providing invaluable reference documents after the course. Continuing Education UnitsUpon completion of the course, participants will be eligible to receive 1.4 Continuing Education Units (CEUs). |
LecturersDr. Tom Bubenik is Director of Integrity Solutions at DNV Columbus (formerly CC Technologies). He has more than 20 years of experience in pipeline integrity assessments, in-line inspection tools and their capabilities, direct assessment techniques and methodologies, field data collection, and the impact of defects and inspection on pipeline operations and maintenance. Dr. Bubenik's research experience covers inspection technologies for pipelines, analysis tools for corroded and damaged pipelines, and repair techniques for pipelines. He also has extensive experience related to in-line inspection of natural gas pipelines including design and operation of inspection vehicles and analysis and interpretation of inspection data. Pam Moreno Gary Smith is president of Inline Services, a Houston-based company specializing in pigging equipment and services. He has 27 years experience in the pipeline pigging industry, working in services such as commissioning and maintenance of pipelines as well as with designing and manufacturing pigging equipment. George Williamson has over 22 years of Operations, maintenance and Integrity Management experience. He is a registered professional engineer, NACE certified corrosion and cathodic protection specialist, and certified pipeline integrity specialist. |
DAY 1
Pigging for Operation and Maintenance
Designing and Implementing an In-line Inspection (ILI) Program
Post In-line Inspection Issues
| Organized by: | |||
| Supported by: | |||
|
![]() ![]() |
|
|
![]() |
![]() |
Silver Sponsor![]() |
|
![]() |
![]() |
Business Center Sponsor![]() |
|
![]() |
![]() |
||